A draft sketch is mistaken for an issued revision.
Detect: Document status and transmittal checks show it lacks approved issue authority.
Recover: Quarantine it as discussion evidence and prevent downstream instruction generation.
Trace a design revision through quantities, procurement, and site sequencing before project teams approve a change.
Explore in the architecture studioIllustrative reference architecture. Validate requirements for your organization.
Illustrative architecture: A commercial building project receives a revised mechanical layout after installation has begun. The contractor needs to identify affected work packages, material orders, and coordination questions. Agents prepare change evidence and scenarios; licensed designers and authorized project managers retain technical and commercial decisions.
Drawings, building models, requests for information, and purchase orders use different identifiers and revision conventions. A generated summary can overlook installed work or treat an unapproved sketch as the governing design, creating rework and contractual confusion.
Revision, quantity, schedule, and procurement specialists examine distinct dependencies. Model comparison and quantity calculation services provide deterministic evidence while agents draft questions and explain bounded schedule scenarios.
The intended result is a reviewable operational decision with source evidence and explicit ownership. Evaluate review preparation and missed dependencies before claiming reduced project delay. Construction outcomes depend on design resolution, site execution, and commercial agreement; the agent system should expose those dependencies rather than obscure them.
Compare approved drawing and model revisions and identify changed elements.
Cannot approve design changes or treat draft drawings as issued instructions.
Map changed elements to measured quantities and installed-work records.
Cannot certify payment quantities or structural adequacy.
Evaluate work-package dependencies and access conflicts around the change.
Cannot authorize unsafe sequencing or alter the contractual baseline.
Retrieve affected orders and draft requests for clarification or change review.
Cannot accept claims, agree prices, or issue subcontract instructions.
Controls model and drawing revisions, issue status, and project permissions.
Owns schedules, work packages, progress evidence, and authorized change records.
Provide committed orders, installation observations, and accountable field confirmations.
flowchart LR
N0["Design change and site impact coordination"]
N1["Revision investigator"]
N2["Quantity impact agent"]
N3["Sequence planner"]
N4["Commercial evidence agent"]
N5["Evidence ledger"]
N6["Human decision"]
N7["Authorized adapter"]
N0 --> N1
N1 --> N2
N2 --> N3
N1 --> N4
N3 --> N4
N4 --> N5
N5 --> N6
N6 --> N7sequenceDiagram
participant O as "Case orchestrator"
participant S as "Common data environment"
participant H as "Accountable reviewer"
O->>S: Verify drawing issue status
S-->>O: Revision remains draft
O->>H: Block instruction and request design clarification
H-->>O: Supply approved issued revision
O->>S: Register governed change evidenceVerify the document's issue status, project scope, and superseded revision before opening a change investigation.
Run governed model or drawing comparisons and retain element identifiers and view references for human inspection.
Join changed elements to installed quantities and active work packages, flagging unverified site reports.
Calculate quantity deltas and bounded schedule scenarios, separating confirmed procurement commitments from estimates.
Present design questions, site conflicts, affected orders, and scenario assumptions to design and project-control owners.
Record approved instructions through established project channels and track acknowledgement by each affected subcontractor or supplier.
Detect: Document status and transmittal checks show it lacks approved issue authority.
Recover: Quarantine it as discussion evidence and prevent downstream instruction generation.
Detect: Element timestamps and field verification records disagree.
Recover: Request a current field check and keep quantity and schedule consequences provisional.
Measurement definitions, not promised improvements.
Time from accepted revision to a coordinated review packet with affected work references.
Reported impacts linked to governed model or drawing elements divided by reported impacts.
Affected installed-work items supported by current verified site evidence divided by affected installed items.
Approved instructions acknowledged by every required recipient divided by issued instruction sets.
| Decision | Benefit | Cost |
|---|---|---|
| Model-based change tracing | Makes revision effects inspectable at element level. | Older drawings and inconsistent identifiers require manual mapping. |
| Scenario schedules | Show possible sequencing consequences before commitment. | Assumptions about productivity and access require field validation. |
| Separate technical and commercial approval | Preserves accountable decision ownership. | Coordination can take longer when approvals are interdependent. |
Project teams verify issued status, element mapping, quantity units, and installed-work contradictions.
One work package receives draft impact packets without contractual instructions or baseline changes.
Approved actions enter existing registers after superseded-document and missing-acknowledgement tests pass.